Ports of Indiana Roadway and Railyard Improvements CEI

Location Burns Harbor, Indiana

Owner Ports of Indiana

Client Ports of Indiana

Services
  • Quality Control and Assurance
  • Project Schedule Monitoring
  • Construction Change Order Coordination
  • Construction Engineering Inspection
  • Materials Testing
  • Construction Engineering Management
  • Railroad Coordination

Using a federal grant under provisions of the Fixing America’s Surface Transportation (FAST) Act, the Ports of Indiana is expanding the east side rail yard, constructing a new west side rail yard, and creating a new connection between the Port’s main rail and the Norfolk Southern (NS) Railroad. Lochner has been hired to provide construction engineering and inspection services.

To accommodate the east side rail yard expansion, East Boundary Drive is being relocated to the west side of the rail facilities near the eastern border of the port. The expansion will increase the rail yard’s capacity to hold 93 rail cars and leverage the port’s new rail‐to‐water interface using a conveyor system and rail dump. The rail yard will also accommodate a 75‐car unit train, which is critical for increasing through‐put at the grain terminal and introducing new commodities. The new west side rail yard, which is being constructed on a 57‐acre U.S. Steel parcel, will accommodate 90 rail cars. When combined with the expansion of the east side rail yard, this project will increase the length of the port’s rail storage to 2.3 miles. It will also allow a switch operator to provide multiple switches for port companies, potentially increasing the port’s through‐put capacity by as much as 300 percent.

The project will connect the main rail and NS via the U.S. Steel easement and tie‐ins to the port’s existing rail infrastructure at Berth 15 and along Sun Drive. This series of new connections will allow the port’s rail freight to bypass congestion at NS’s switching yard and more efficiently access the new west side rail yard. It will also create enough rail capacity for the port to take on switching duties, thereby reducing inefficient turns, mitigating existing delays associated with using an external switcher, and enhancing overall freight rail through‐put for the port.

Lochner’s responsibilities include contract oversight and construction administration, including overseeing materials testing, implementing project financial controls, and inspecting all work as the project progresses.

Related Projects

Regional Transportation District (RTD) FasTracks Program

The FasTracks transit expansion program is transforming transportation through the Denver metro region.  FasTracks is a $6.5 billion comprehensive transit [&he […]

See the Project

LA Metro Program Control Support Services (PCSS)

We are assisting Metro’s Program Management Department in managing and supporting the delivery of its Measure M capital program.  Our […]

See the Project

Valley Metro South Central Light Rail Extension

The extension will connect South Phoenix to the regional light rail system.  The project includes a hub in downtown Phoenix, […]

See the Project